| 01 | Start and feasibility | Preliminary analysis and techno-economic feasibility, demonstrator check sample, preliminary specification attached to the development contract. | Preliminary specification, contract, WBS |
| 02 | Project management | Kick-off, multi-level planning, risk analysis (DFMEA with residual LVD risk, project FMEA), frozen and maintained specification. | Plan, FMEA, specification with revisions |
| 03 | Design | Thermodynamics, mechanics with FEM, electronic control (hardware and firmware), aesthetics and interface, costs and tooling break-even; LVD and EMC pre-compliance. Phase approval with the customer. | P&ID, schematics, 3D, costed BOM, firmware |
| 04 | Laboratory validation | Verification samples per component and per laboratory, qualification plan filtered on the FMEA, tests with checklists, report review. | Test plan, reports, archived data |
| 05 | Field test and life test | Verification samples in the field: start-up, commissioning, monitoring with data logging. | Field logs, report |
| 06 | Certifications | Electrical safety (EN 60335-1, -2-40), EMC and RED, PED, ErP and labelling, MEPS, REACH and RoHS. | Technical file, conformity reports |
| 07 | Transfer to production | Final technical file, series sample with acceptance test, tests on final units; line support (layout, timing, station suppliers), budget and final-approval gates, pilot production. | File, test protocol, pilot line |
| 08 | Series and operation | Firmware version per serial number, staged over-the-air updates with rollback, post-release support. | Series product, monitored fleet |